
Highway Construction
ZUSMARSHAUSEN, GERMANY – JULY 15: Construction site of the extension of A8 highway from currently 4 to 6 lanes at Zusmarshausen, Germany on July 15, 2012. Heavy machinery is used for this massive project happening in a timeframe of over 2 years.
heavy, industrial, bulldozer, architecture, shovel, machinery, freeway, earth, transportation, work, soil, traffic, construction, dig, ground, motorway, urban, machine, construct, equipment, engineering, truck, new, excavation, digger, germany, working, road, job, development, paving, worker, building, infrastructure, asphalt, highway, site, develop, build, zusmarshausen, excavator, dirt, excavate, land, concrete, technology, digging, vehicle, industry
One Time Use License | |||
|
RF Unlimited License | |||
|
#19277 / Created by franky242 photography / JPG Image / 7.91 MB / 4288 x 2848
All images are protected by our Pixel Guarantee. Vectors will be converted to JPEGs for non-full sizes. Vector colors may vary in final file.
Report this product