Highway Construction
ZUSMARSHAUSEN, GERMANY – JULY 15: Construction site of the extension of A8 highway from currently 4 to 6 lanes at Zusmarshausen, Germany on July 15, 2012. Heavy machinery is used for this massive project happening in a timeframe of over 2 years.
motorway, build, dig, shovel, worker, industry, machine, excavate, machinery, zusmarshausen, land, concrete, construction, truck, dirt, soil, digger, road, industrial, digging, work, building, traffic, infrastructure, engineering, excavator, construct, paving, vehicle, working, urban, new, heavy, freeway, development, site, technology, job, architecture, develop, earth, germany, ground, equipment, transportation, excavation, asphalt, bulldozer, highway
One Time Use License | |||
|
RF Unlimited License | |||
|
#19277 / Created by franky242 photography / JPG Image / 7.91 MB / 4288 x 2848
All images are protected by our Pixel Guarantee. Vectors will be converted to JPEGs for non-full sizes. Vector colors may vary in final file.
Report this product