
Highway Construction
ZUSMARSHAUSEN, GERMANY – JULY 15: Construction site of the extension of A8 highway from currently 4 to 6 lanes at Zusmarshausen, Germany on July 15, 2012. Heavy machinery is used for this massive project happening in a timeframe of over 2 years.
equipment, digging, architecture, industry, site, germany, zusmarshausen, motorway, dig, vehicle, industrial, land, worker, digger, truck, job, excavate, asphalt, heavy, transportation, earth, construction, excavation, urban, build, construct, dirt, new, work, ground, soil, bulldozer, excavator, technology, road, working, infrastructure, develop, machine, development, building, paving, shovel, concrete, machinery, highway, traffic, engineering, freeway
One Time Use License | |||
|
RF Unlimited License | |||
|
#19277 / Created by franky242 photography / JPG Image / 7.91 MB / 4288 x 2848
All images are protected by our Pixel Guarantee. Vectors will be converted to JPEGs for non-full sizes. Vector colors may vary in final file.
Report this product





































