
Highway Construction
ZUSMARSHAUSEN, GERMANY – JULY 15: Construction site of the extension of A8 highway from currently 4 to 6 lanes at Zusmarshausen, Germany on July 15, 2012. Heavy machinery is used for this massive project happening in a timeframe of over 2 years.
job, construction, traffic, work, worker, vehicle, zusmarshausen, site, paving, infrastructure, industrial, digger, motorway, asphalt, building, dirt, excavation, construct, bulldozer, equipment, heavy, freeway, road, build, shovel, concrete, germany, new, excavate, urban, machine, working, machinery, engineering, develop, technology, transportation, excavator, highway, industry, earth, land, truck, soil, development, ground, architecture, dig, digging
One Time Use License | |||
|
RF Unlimited License | |||
|
#19277 / Created by franky242 photography / JPG Image / 7.91 MB / 4288 x 2848
All images are protected by our Pixel Guarantee. Vectors will be converted to JPEGs for non-full sizes. Vector colors may vary in final file.
Report this product





































