Highway Construction
ZUSMARSHAUSEN, GERMANY – JULY 15: Construction site of the extension of A8 highway from currently 4 to 6 lanes at Zusmarshausen, Germany on July 15, 2012. Heavy machinery is used for this massive project happening in a timeframe of over 2 years.
soil, paving, build, excavate, freeway, machine, concrete, architecture, machinery, site, industrial, work, digging, zusmarshausen, new, job, excavation, working, development, transportation, urban, equipment, infrastructure, worker, construction, dig, land, bulldozer, germany, heavy, dirt, motorway, earth, highway, excavator, traffic, asphalt, ground, digger, shovel, building, truck, vehicle, industry, develop, engineering, construct, technology, road
One Time Use License | |||
|
RF Unlimited License | |||
|
Model Release
Property Release
#19283 / Created by franky242 photography / JPG Image / 7.61 MB / 3989 x 2649All images are protected by our Pixel Guarantee. Vectors will be converted to JPEGs for non-full sizes. Vector colors may vary in final file.
Report this product