
Highway Construction
ZUSMARSHAUSEN, GERMANY – JULY 15: Construction site of the extension of A8 highway from currently 4 to 6 lanes at Zusmarshausen, Germany on July 15, 2012. Heavy machinery is used for this massive project happening in a timeframe of over 2 years.
freeway, worker, equipment, new, excavation, earth, construction, truck, excavate, paving, job, machinery, traffic, technology, urban, soil, machine, develop, industry, industrial, germany, motorway, construct, work, architecture, building, zusmarshausen, land, dirt, build, infrastructure, ground, development, transportation, heavy, shovel, site, highway, concrete, engineering, vehicle, bulldozer, digging, excavator, dig, road, digger, working, asphalt
One Time Use License | |||
|
RF Unlimited License | |||
|
#22668 / Created by franky242 photography / JPG Image / 6.34 MB / 2848 x 4288
All images are protected by our Pixel Guarantee. Vectors will be converted to JPEGs for non-full sizes. Vector colors may vary in final file.
Report this product