
Highway Construction
ZUSMARSHAUSEN, GERMANY – JULY 15: Construction site of the extension of A8 highway from currently 4 to 6 lanes at Zusmarshausen, Germany on July 15, 2012. Heavy machinery is used for this massive project happening in a timeframe of over 2 years.
freeway, engineering, construct, highway, site, asphalt, digger, soil, road, excavation, dirt, architecture, vehicle, shovel, work, construction, machine, machinery, industrial, equipment, traffic, motorway, truck, digging, dig, worker, zusmarshausen, land, concrete, paving, ground, excavate, industry, job, working, build, excavator, building, development, urban, transportation, develop, bulldozer, earth, technology, heavy, germany, infrastructure, new
One Time Use License | |||
|
RF Unlimited License | |||
|
#22597 / Created by franky242 photography / JPG Image / 8.17 MB / 4288 x 2848
All images are protected by our Pixel Guarantee. Vectors will be converted to JPEGs for non-full sizes. Vector colors may vary in final file.
Report this product





































